2008

Removing the Gap Between ECAD and MCAD Design

Please Login at the top
of the page to download.

For ECAD and MCAD to collaborate in “real-time” a direct method of communication that facilitates a shared flow of data back and forth between design teams is required. This flow must support “what-if” scenarios of design baselines and change proposals along with the ability to counter-propose changes. Once design agreements are made, the flow must also dynamically update the design databases. This unique ECAD-MCAD (EDMD) collaborative environment has not been available until now. This desktop PCB design provides a real-time integrated ECAD-MCAD collaboration environment that enables Electrical and Mechanical design teams to work together throughout the entire design process.

 

White Papers

Fundamentals of Vector Network Analysis Primer
Sponsored by Rohde and Schwarz A and D
Metal Injection Molding Turns the Volume Up, and Down
Sponsored by Proto Labs
Remediation and Prevention of Moisture in Electronics
Sponsored by multisorb technologies
Aqueous Critical Cleaning: A White Paper
Sponsored by Alconox
SpaceClaim in Manufacturing
Sponsored by SpaceClaim
Aerospace Tooling: 3D Technology Enables Virtual Design
Sponsored by FARO

White Papers Sponsored By: