2011

Reliability Testing of GORE® Protective Vents in Telecommunication Enclosures

Please Login at the top
of the page to download.

Premature failure of telecommunication equipment leads to network downtime, higher costs, increased maintenance and decreased brand loyalty. One of the most significant challenges for this equipment is withstanding the conditions of the environment in which it is installed.

 

Although a non-vented sealed enclosure can pass the IEC 60068-2-1 cold temperature test protocol, internal pressures can reach levels that result in compromised seals and premature device failure. As a result, many manufacturers find that after installation, their equipment does not maintain reliable performance for its expected lifespan even though it had passed the testing protocols for both water immersion and temperature cycling.

White Papers

How Paper-based 3D Printing Works: The Technology and Advantages
Sponsored by Mcor Technologies
Unique Method for Orifice Production
Sponsored by Bird Precision
Automated Inspection Lowers Solar Cell Costs
Sponsored by Teledyne DALSA
Learn LED Test Techniques
Sponsored by Keithley
The True Cost of Bearing Lubrication
Sponsored by igus
Force Sensors for Design
Sponsored by Tekscan

White Papers Sponsored By: