Privacy

Reliability Testing of GORE® Protective Vents in Telecommunication Enclosures

Please Login at the top
of the page to download.

Premature failure of telecommunication equipment leads to network downtime, higher costs, increased maintenance and decreased brand loyalty. One of the most significant challenges for this equipment is withstanding the conditions of the environment in which it is installed.

Although a non-vented sealed enclosure can pass the IEC 60068-2-1 cold temperature test protocol, internal pressures can reach levels that result in compromised seals and premature device failure. As a result, many manufacturers find that after installation, their equipment does not maintain reliable performance for its expected lifespan even though it had passed the testing protocols for both water immersion and temperature cycling.

White Papers

Broadening the Scope of User Requirements When Selecting Valves for Medical Devices
Sponsored by B Braun
Using Acoustic Beamforming for Pass-By Noise Source Detection
Sponsored by National Instruments
Oscilloscope Fundamentals Primer
Sponsored by Rohde and Schwarz
PICO xMOD Data Sheet
Sponsored by Nordson EFD
Future Advances in Body Electronics
Sponsored by Freescale
Removing the Gap Between ECAD and MCAD Design
Sponsored by Mentor Graphics

White Papers Sponsored By: