Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software. This is achieved by combining two prior programs in an innovative manner:

  • First Program : The first of these programs is the Advanced Risk Reduction Tool (ARRT), which can be used to calculate the costs and benefits of a set of assurance activities on a given software project. ARRT is itself based on a risk-management tool, Defect Detection and Prevention (DDP). DDP uses a detailed mathematical model of requirements, risks, and mitigations.

  • Second Program : The second of these programs is the TAR2 "treatment learner," which can be used to determine from a large set of factors those factor settings most critical to attaining a given objective.

  • Innovative Combination : The major contribution of this work is the combination of these two programs. They are combined so as to operate in an iterative procedure, as follows: In each cycle of the iteration, TAR2 is tuned to identify the most critical software assurance activities, both those most critical to perform (because they contribute to cost-effective risk reduction), and those most critical to not perform (because they detract from cost-effective risk reduction).

These identified activities are then set accordingly in ARRT, and the cost-benefit calculations rerun. Repeating this cycle determines more and more activities to perform (and/or to not perform), culminating in a solution that is (near) optimal. An important aspect of this approach is that it allows for human experts to add further guidance during each iteration of the cycle. For example, if the experts observe that two of the recommended activities are actually incompatible (say, because they would both require use of the same limited resource at the same time), they can reject the TAR2 recommendations involving this pair of activities, and instead ask for the next-best solution. This makes good use of the experts' time, since they are only asked for guidance pertinent to promising solutions.

This innovation was developed by Martin Feather and Steven Cornford of Caltech and Tim Menzies of the University of British Columbia for NASA's Jet Propulsion Laboratory